Plan verification and signature by a qualified architect

In several cantons, and for many types of project, plans submitted with a building permit application must be signed by a qualified architect registered with the professional register the canton requires (for example REG A or REG B, or a cantonal register). PlanSign lets draftsmen, design offices, contractors and foreign architects obtain that signature in a sound professional framework.

PS-03

Signature after review

The signing architect takes on professional liability. That is why they only sign after reviewing all the plans and obtaining the necessary corrections. This is what makes the process reliable for you and for the authority examining the application.

According to your canton's rules

Signature requirements vary from canton to canton and with the nature of the project. We check which qualifications your application requires and appoint an architect entitled to sign in that canton.

A role defined from the outset

The quote specifies the architect's role: signing the application plans, handling the authority's requests for additional information, or broader support. You know exactly what is covered.

What you receive

  • Complete review of the plan set
  • List of corrections required before signing
  • Plans signed by a qualified architect
  • Follow-up on the authority's requests, as agreed in the quote

Fees and costs

  • Fees calculated according to the SIA 102 regulations (services and fees of architects), set out in a written quote.
  • We do not do any drafting: corrections are made by you or your draftsman, following our instructions. Any drafting work you would like us to take on is charged as additional fees, by the hour.
  • Printing of plans and application documents is the client's responsibility. On request, we order it from our partner printer (e.g. Plott Info); these costs are invoiced separately.

Who it is for

Frequently asked questions

Do my plans have to be signed by an architect?

It depends on the canton and the project. In several cantons, particularly in French-speaking Switzerland and Ticino, most applications require the signature of a qualified professional. We confirm this free of charge at the start.

Do you sign plans without checking them?

No. The signature always follows a complete review and the necessary corrections. This is non-negotiable.

What do REG A and REG B mean?

REG is the Swiss Foundation for the Registers of Engineering, Architecture and Environmental Professionals. Registration certifies a level of qualification and is used by several cantons as a reference for the right to sign.

Related services

  1. PS-01

    Preliminary project assessment

    Find out from the start whether your project can be built on the plot, and under what conditions.

  2. PS-02

    Architectural plan review

    A complete check of your plans by an architect, with a precise list of corrections.

  3. PS-04

    Plan corrections and regulatory compliance

    We specify each correction precisely and check the revised plans until they comply.

  4. PS-05

    Building permit application assistance

    A complete building permit application, correctly submitted and followed up until the decision.

  5. PS-06

    Long-term partnerships with construction professionals

    A partner architect for your recurring applications, with terms and turnaround agreed in advance.

Do you have plans to review or sign?

Send us your plans: we reply within one working day with an initial assessment and a quote.

Every project is different: our fees are calculated according to the SIA 102 regulations, and we prepare a free, no-obligation quote once we have seen your documents.

Request a quote

Describe your project and attach your plans if you like. We reply within one working day.

PDF, DWG, DXF, IFC, JPG, PNG or ZIP – 3 files, 15 MB in total.